Construction Project Management Services and Construction Books
  • Construction Home
  • About Paul Netscher
  • +Construction Books
    • Successful Construction Project Management
    • Building a Successful Construction Company
    • Construction Claims
    • Construction Project Management: Tips and Insights
    • Construction Management: From Project Concept to Completion
    • An Introduction to Building and Renovating Houses
    • The Successful Construction Supervisor and Foreman
    • Designing your ideal home
  • Construction Management Services
  • Book Reviews
  • Contact
  • Blog | Construction Management
  • Site Map
  • Blog | Home Improvement
  • Index of construction articles
  • Useful Links
  • Index Home Improvement

What Really Drives Directional Drilling Costs? 5 Key Factors to Track

25/6/2025

0 Comments

 
Picture
Photo by Paul H: https://www.pexels.com
Directional drilling—also called horizontal directional drilling (HDD)—lets crews place pipes and cables beneath roads, rivers, and yards with almost no surface mess. But bid prices can swing from one job to the next, sometimes climbing faster than material indexes alone can explain. Understanding why the numbers move is the first step to building tighter bids and avoiding unwelcome surprises in the field. While every project is unique, contractors across the globe see the same five cost drivers again and again.

Below you’ll find a plain‑language look at each factor, fresh field tips, and a simple tool you can use to test numbers on your own project.

5 Factors That Influence The Price of Horizontal Directional Drilling

​1. Bore Length
The first driver is plain geometry: the longer the shot, the more hours, fuel, drilling mud, and tool wear you rack up. Distance also influences steering accuracy—longer bores demand more frequent surveys and may need additional tracking coils or wireline tools. Longer alignments increase risk exposure to unforeseen obstacles such as abandoned utilities, meaning contingency funds must rise in step with footage.
  • Short bores (<100 ft / 30 m) carry the same setup time as long ones, so dollars per foot look high.
  • Medium runs (100 – 600 ft / 30 – 180 m) often hit the sweet spot where crews find a rhythm and unit cost drops.
  • Long shots (>600 ft / 180 m) need bigger rigs, stronger tracking gear, and more mud. Unit cost climbs again.
Field note: On one recent job, combining three 80‑ft shots into a single 240‑ft pass shaved off extra pit excavation and saved roughly 12 percent on total cost.
Quick tip: If a design calls for several short bores, ask the engineer if any can be merged into one medium run. One setup, one cleanup—lower cost. Also, verify minimum bend‑radius limits for the product pipe before lengthening the alignment so you don’t introduce new stress points at entry and exit.

2. Ground Conditions
Soil is the wildcard. Sand cuts fast but collapses. Clay holds shape but sticks. Cobbles bounce bits. Solid rock can grind a job to a halt without the right head and torque. Even within a single alignment, conditions can change every few feet, so continuous monitoring is essential.
  1. Pick tooling early. Switching mid‑job is pricey.
  2. Match mud mix to soil. Thick bentonite for sand, thinner mix for clay, polymer for sticky ground.
  3. Plan your pace. Hard rock can cut daily footage in half and double bit wear. A staged pre‑ream in mixed ground often pays for itself by preventing sudden tool stalls.
A geotechnical investigation that costs a few thousand dollars can prevent tens of thousands in down‑time and broken tooling later. If a full report isn’t feasible, at least arrange some test pits or review bore logs from nearby projects to spot layers that might wreak havoc on production.

Field note: In loose river sand, a 200‑ft bore might finish in one shift. Put the same bore in fractured granite, and you could need a week—plus premium tri‑cone bits that cost five times more.

Even one surprise boulder can wreck a schedule—so get a soil report or a nearby bore log wherever possible, and build an allowance for unexpected ground in the bid.

3. Pipe Size and Material
  • Diameter matters twice. A bigger pipe means a larger pilot hole and wider ream passes.
  • Material affects the pull force. HDPE bends more easily than steel, easing rig load.
  • Joint time counts. Fusing HDPE or welding steel during staging adds labor hours. Protective coatings or liner sleeves can also add thickness, pushing you into the next rig class.
Why SDR matters: A 6‑in SDR 11 HDPE pipe weighs about 3 lb per foot, while SDR 17 of the same size is closer to 1.9 lb. A lighter pipe may let you stay with a mid‑size rig instead of renting a 100‑ton pullback machine.

Supplier lead times also creep into cost when large diameters or specialty linings are required; idle crews waiting on pipe eat margin fast. In design reviews, ask whether a slightly smaller diameter or different wall thickness could meet flow requirements while preventing an expensive rig‑size jump.

A common rule of thumb: double the pipe diameter and mud volume can jump three‑ to four‑fold. Price it that way.

4. Site Access and Logistics
The best drill plan fails if the rig can’t reach the entry pit or if vac trucks can’t sit nearby. Tight access also affects crew safety and may force a different rig orientation, which in turn changes bend radius calculations.
  • Tight work space near traffic lanes or pedestrian paths.
  • Long hose runs when support trucks park off‑site.
  • Permit windows that squeeze work hours.
  • Local noise limits that may require sound curtains or off‑peak shifts.
  • Traffic control costs for flaggers or lane closures can quietly erode margins if not captured in the bid.
Pipe‑string staging often needs more real estate than the drill itself—ensure there’s enough clearance to fuse, align, and pull the product without obstructing existing utilities or overhead power lines. If space is limited, plan sectional pulls with mid‑welds and factor extra labor and inspection time into the quote.

Paul Netscher’s post on 10 tips for successfully pricing construction projects offers a handy checklist that flags site limits early.

Field note: A recent urban infill project spent more crew time winching a rig through a narrow alley than drilling. Access delays alone took nearly a fifth of the bid margin.

5. Fluid Management and Environmental Rules
Drilling mud cools the bit, carries cuttings, and keeps the hole open. It also drives three costs:
  1. Volume made—tied to bore size and soil type.
  2. Additives used—polymers, soda ash, lost‑circulation material.
  3. Disposal plan. Some jobs allow on‑site drying; others need vac trucks and off‑site dump fees.
Recycle if you can: Closed‑loop systems reclaim water, cut additive use, and shrink truck traffic—a triple win when space allows. Staying compliant also avoids hefty fines that can dwarf the disposal budget.

Environmental rules grow stricter every year, and some jurisdictions now require real‑time turbidity monitoring or sediment sampling for fluid returns. Documenting your handling plan in advance shows regulators you take stewardship seriously and can speed up permit approvals.
​
Strict rules near waterways or dense neighborhoods can double disposal cost overnight. Build a “what‑if” line in your estimate and revisit it after the pre‑job meeting to keep budgets realistic.

Getting Your Cost Estimate Right

Each factor—length, ground, pipe, access, and fluids—interacts with the others. Change one and costs ripple through the rest. A 400‑ft sand bore with 4‑in HDPE may come in under budget, while the same length through shale with 10‑in steel can bust it. Adding a contingency line for unforeseen conditions protects both the contractor and the client, fostering trust.

Modern estimating software allows you to model these variables quickly, but the tool is only as good as the field data you feed it. Encourage drill operators to log footage, mud mix, and tooling wear daily so future bids reflect real productivity, not best‑case hopes.
​
Want to see how one tweak changes the bottom line? Plug your own lengths, diameters, and soils into this interactive directional drilling cost calculator and watch the totals shift in real time.

Quick Estimating Checklist

  1. Check soil data—geotech report or past bore log.
  2. Survey the surface path—include extra feet for entry and exit slopes.
  3. Lock pipe specs early—diameter, material, wall thickness.
  4. Walk the site—confirm rig pad, support‑truck parking, and spoil area.
  5. Confirm disposal rules—city, county, or water‑way limits.
  6. Add a buffer—5–10 percent for unknowns is cheap insurance.

Faster and Better Construction Projects

Directional drilling saves pavement, reduces traffic tie‑ups, and often finishes faster than open‑cut trenching—but only when costs are forecasted with care. Track these five drivers, review field data often, and update assumptions as soon as new info lands. You’ll bid tighter, build smoother, and protect your margin. Collaboration between engineers, contractors, and inspectors early in the design phase can uncover hidden risks and trim months off the schedule.
​
Continuous improvement thrives on transparency. Share lessons learned—good and bad—with the wider team and, when possible, the broader HDD community. By pooling data and experience, the industry as a whole delivers safer, more predictable underground installations.

Author

Article provided by Devco Development & Engineering, a California-based underground utility contractor specializing in trenchless technology, including horizontal directional drilling, hydro excavation, and pipe bursting. Devco provides safe, efficient, and eco-friendly underground utility solutions.

This article is a guest post and the owners of this website take no responsibility for the content or it's originality. The website publishes this article in good faith with the undertaking from the author and supplier that the content has not been plagiarised. Please report any errors in the article to the website owners. Should you prove the content is not original the article will be immediately taken down.

Learn how to become a successful construction project manager.

Picture
​Paul Netscher has written several easy-to-read books for owners, contractors, construction managers, construction supervisors and foremen. They cover all aspects of construction management and are filled with tips and insights.
Visit to read more.

The books are available in paper and ebook from most online stores including Amazon.

Note: We welcome genuine comments, especially comments that add additional information to the subject matter in the article. We however reserve the right to remove inappropriate comments, which includes comments that have nothing to do with the subject, comments that include inappropriate language, and comments that are an advertisement for a product or company, or which include an advertising link. We will not enter into discussion on why a particular comment was removed.
construction management construction project management
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    Picture
    Picture
    Picture

    Archives

    December 2024
    November 2024
    October 2024
    June 2024
    April 2024
    March 2024
    February 2024
    January 2024
    September 2023
    July 2023
    May 2023
    March 2023
    January 2023
    October 2022
    August 2022
    June 2022
    May 2022
    March 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014

    ​Note: We welcome genuine comments, especially comments that add additional information to the subject matter in the article. We however reserve the right to remove inappropriate comments, which includes comments that have nothing to do with the subject, comments that include inappropriate language, and comments that are an advertisement for a product or company, or which include an advertising link. Comments must be in English. We will not enter into discussion on why a particular comment was removed.

    Categories

    All

    RSS Feed

    Copyright 2016 - The attached articles cannot be reproduced for commercial purposes without the consent of the author.
    The opinions expressed in the attached articles are those of the writer. It should be noted that projects are varied and different laws and restrictions apply which depend on the location of the contractor and the project. It's important that the reader uses the supplied information taking cognisance of their particular circumstances. The writer assumes no responsibility or liability for any loss of any kind arising from the reader using the information or advice contained herein.
    Picture
    "I have what I consider some of the best books on construction management."

    Books are available from:
    Amazon.com
    Amazon.co.uk
    takealot.com

    kalahari.com
    Amazon.in
    Amazon.de
    Amazon.fr
    Amazon.it
    Amazon.com.au
    Powell's
    Fishpond
    uread
    bokus
    Amazon.ca
    Amazon.es
    Other retail stores

    Available in paperback or on Kindle
    Picture
    ​"28 YEARS OF CONSTRUCTION PROJECT MANAGEMENT EXPERIENCE, DEVELOPING SUCCESSFUL CONSTRUCTION PROJECT MANAGERS AND BUILDING SUCCESSFUL CONSTRUCTION COMPANIES"
    Picture
    Picture
    Picture

Construction Books

Successful Construction Project management
Building a Successful Construction Company
Construction Claims: A Short Guide for Contractors
Construction Management: From Project Concept to Completion
Construction Project Management: Tips and Insights
​
Build and Renovate Your Home With Your Eyes Wide Open
Book Reviews

Construction services

Construction Management Services
Paul Netscher
Construction Management Blog
​Home Improvement Blog

Contact
Developing Successful Construction Project Managers.

Building Successful Construction Companies.
30 years of construction project management experience
  • Construction Home
  • About Paul Netscher
  • +Construction Books
    • Successful Construction Project Management
    • Building a Successful Construction Company
    • Construction Claims
    • Construction Project Management: Tips and Insights
    • Construction Management: From Project Concept to Completion
    • An Introduction to Building and Renovating Houses
    • The Successful Construction Supervisor and Foreman
    • Designing your ideal home
  • Construction Management Services
  • Book Reviews
  • Contact
  • Blog | Construction Management
  • Site Map
  • Blog | Home Improvement
  • Index of construction articles
  • Useful Links
  • Index Home Improvement