Construction Project Management Services and Construction Books
  • Construction Home
  • About Paul Netscher
  • +Construction Books
    • Successful Construction Project Management
    • Building a Successful Construction Company
    • Construction Claims
    • Construction Project Management: Tips and Insights
    • Construction Management: From Project Concept to Completion
    • An Introduction to Building and Renovating Houses
    • The Successful Construction Supervisor and Foreman
    • Designing your ideal home
  • Construction Management Services
  • Book Reviews
  • Contact
  • Blog | Construction Management
  • Site Map
  • Blog | Home Improvement
  • Index of construction articles
  • Useful Links
  • Index Home Improvement

what you should consider when staffing your construction projects

28/2/2015

3 Comments

 
Having the correct type and numbers of construction staff (Section Managers, Supervisors, Engineers, Contract Administrators, etc) on your construction project can be the key to its success.

The risks of having the incorrect staff
I’ve sometimes been guilty of under-staffing my construction projects. The risk with that is:
1. if a member of staff falls ill or resigns there’s nobody who can take on an additional roll
2. tasks are rushed because people don't have sufficient time because they are doing too many things at once, resulting in mistakes and items being overlooked
3. staff work under pressure, and long hours, which may lead to them resigning
Obviously having too many staff leads to:
1. higher project costs which were not allowed for
2. staff becoming unhappy due to boredom and feeling underutilised
Obviously having staff with the wrong skills or those that don't have the required experience can also create major problems

Factors that affect a construction project's staffing requirements
The numbers of staff and their positions on a construction project depend on a number of factors, such as the:
1. number of construction work areas – each work area may require its own Supervisor
2. numbers of workers required to complete the work – there is often an optimum number of workers that a supervisor can look after
3. available skills of the construction workers – if the workers are poorly skilled or inexperienced they usually require more supervision to ensure they perform their tasks correctly and safely
4. complexity of the construction project – more complex projects may require more Engineers and Supervisors while a project which is simple or has lots of repartition may be easier to manage
5. relative locations of the work areas and their distance apart – travelling between different work areas can make Supervisors time unproductive or mean workers are left standing waiting for instructions when the Supervisor is on another distant part of the project
6. client requirements – some clients specify the minimum ratio of Supervisors to workers, while others may dictate that they require dedicated individuals to specific tasks, even though the contractor wouldn’t normally have a dedicated person
7. contract reporting requirements – some clients and project managers may require elaborate and detailed regular reports which can be time consuming for the contractor to prepare
8. skills and experience of the available staff – more experienced staff may be able to supervise a larger work area with more workers
9. project schedule (or programme/program) – fast-track construction projects of high intensity may need more supervision
10. quality and experience of the client and their design team – projects where the client has to be assisted, or where information is late or of a poor quality often require more input from the contractor, and projects with multiple claims and variations may require additional contracts administration staff
Staff numbers also depend on the different skills and disciplines required. For instance in the civil industry Supervisors may only be skilled in earthworks, while others are skilled in concrete works, electrically orientated, or more suited to building trades. If you can employ a Supervisor skilled in a multitude of disciplines, there’s often a reduction in the number of staff required.
To assist with calculating staff requirements prepare a project organisational chart. This shows the different levels and types of management required, the reporting structures, as well as the different roles and responsibilities. In addition the chart could indicate whether the staff are required full-time or shared between projects, and if they are Head Office or site-based positions.
Remember also that if the project has to work nights, or weekends, additional staff will be required to supervise and manage these shifts.

Conclusion
It’s necessary that careful thought goes into correctly staffing your construction project to achieve the best balance of efficiencies and costs. In Australia for instance, the cost of a Supervisor is not much greater than some craft workers, so it may pay in some cases to have more supervision just to improve the efficiencies of the workers.
Once you have determined the number and types of skills required you can begin sourcing the best people to fill the positions. This is a topic which I will deal with later.

(Paul Netscher is the author of the acclaimed books ‘Successful Construction Project Management: The Practical Guide’ and ‘Building a Successful Construction Company: The Practical Guide’. Both books are available in paperback and E-book from Amazon and other retail outlets. This article is adapted from his book ‘Successful Construction Project Management’)
construction management construction project management
3 Comments
Jose Colon
27/4/2020 10:01:20 pm

What do you recommend as foreman to worker ratio for a large job?

Reply
Paul
28/4/2020 11:46:44 am

Hello Jose, the foreman ration depends on a number of things. A skilled workforce may require less supervision. Intricate tasks require more supervision. Projects that are spread out may require more supervision as the foreman spends time moving between tasks. Experienced foremen can look after a bigger team. If the foreman is responsible for setting out the work this takes time. Work that is labour intensive may mean more people per foreman. Some clients demand a particular ratio - particular where safety is an issue.
So the worker to foreman ration could be anywhere from 8 to 25.

Reply
formwork engineering link
14/7/2020 07:47:00 pm

Wonderful information about what you should consider when staffing your construction projects, thanks a lot for sharing kind of content with us. Your blog gives the best and the most interesting information. I wonder if we can gather such practical information about it, a great post definitely to come across.

Reply



Leave a Reply.

    As an Amazon Associate I earn from qualifying purchases

    Archives

    January 2023
    October 2022
    August 2022
    June 2022
    May 2022
    March 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014

    Categories

    All

    RSS Feed

    Copyright 2016 - The attached articles cannot be reproduced for commercial purposes without the consent of the author.
    The opinions expressed in the attached articles are those of the writer. It should be noted that projects are varied and different laws and restrictions apply which depend on the location of the contractor and the project. It's important that the reader uses the supplied information taking cognisance of their particular circumstances. The writer assumes no responsibility or liability for any loss of any kind arising from the reader using the information or advice contained herein.
    "I have what I consider some of the best books on construction management."


    Books are available from:
    Amazon.com
    Amazon.co.uk
    takealot.com

    kalahari.com
    Amazon.in
    Amazon.de
    Amazon.fr
    Amazon.it
    Amazon.com.au
    Powell's
    Fishpond
    uread
    bokus
    Amazon.ca
    Amazon.es
    Other retail stores


    Available in paperback or on Kindle

    ​"28 YEARS OF CONSTRUCTION PROJECT MANAGEMENT EXPERIENCE, DEVELOPING SUCCESSFUL CONSTRUCTION PROJECT MANAGERS AND BUILDING SUCCESSFUL CONSTRUCTION COMPANIES"

Construction Books

Successful Construction Project management
Building a Successful Construction Company
Construction Claims: A Short Guide for Contractors
Construction Management: From Project Concept to Completion
Construction Project Management: Tips and Insights
​
Build and Renovate Your Home With Your Eyes Wide Open
Book Reviews

Construction services

Construction Management Services
Paul Netscher
Construction Management Blog
​Home Improvement Blog

Contact
Developing Successful Construction Project Managers.

Building Successful Construction Companies.
30 years of construction project management experience
  • Construction Home
  • About Paul Netscher
  • +Construction Books
    • Successful Construction Project Management
    • Building a Successful Construction Company
    • Construction Claims
    • Construction Project Management: Tips and Insights
    • Construction Management: From Project Concept to Completion
    • An Introduction to Building and Renovating Houses
    • The Successful Construction Supervisor and Foreman
    • Designing your ideal home
  • Construction Management Services
  • Book Reviews
  • Contact
  • Blog | Construction Management
  • Site Map
  • Blog | Home Improvement
  • Index of construction articles
  • Useful Links
  • Index Home Improvement