Having the correct type and numbers of construction staff (Section Managers, Supervisors, Engineers, Contract Administrators, etc) on your construction project can be the key to its success.
The risks of having the incorrect staff I’ve sometimes been guilty of under-staffing my construction projects. The risk with that is: 1. if a member of staff falls ill or resigns there’s nobody who can take on an additional roll 2. tasks are rushed because people don't have sufficient time because they are doing too many things at once, resulting in mistakes and items being overlooked 3. staff work under pressure, and long hours, which may lead to them resigning Obviously having too many staff leads to: 1. higher project costs which were not allowed for 2. staff becoming unhappy due to boredom and feeling underutilised Obviously having staff with the wrong skills or those that don't have the required experience can also create major problems Factors that affect a construction project's staffing requirements The numbers of staff and their positions on a construction project depend on a number of factors, such as the: 1. number of construction work areas – each work area may require its own Supervisor 2. numbers of workers required to complete the work – there is often an optimum number of workers that a supervisor can look after 3. available skills of the construction workers – if the workers are poorly skilled or inexperienced they usually require more supervision to ensure they perform their tasks correctly and safely 4. complexity of the construction project – more complex projects may require more Engineers and Supervisors while a project which is simple or has lots of repartition may be easier to manage 5. relative locations of the work areas and their distance apart – travelling between different work areas can make Supervisors time unproductive or mean workers are left standing waiting for instructions when the Supervisor is on another distant part of the project 6. client requirements – some clients specify the minimum ratio of Supervisors to workers, while others may dictate that they require dedicated individuals to specific tasks, even though the contractor wouldn’t normally have a dedicated person 7. contract reporting requirements – some clients and project managers may require elaborate and detailed regular reports which can be time consuming for the contractor to prepare 8. skills and experience of the available staff – more experienced staff may be able to supervise a larger work area with more workers 9. project schedule (or programme/program) – fast-track construction projects of high intensity may need more supervision 10. quality and experience of the client and their design team – projects where the client has to be assisted, or where information is late or of a poor quality often require more input from the contractor, and projects with multiple claims and variations may require additional contracts administration staff Staff numbers also depend on the different skills and disciplines required. For instance in the civil industry Supervisors may only be skilled in earthworks, while others are skilled in concrete works, electrically orientated, or more suited to building trades. If you can employ a Supervisor skilled in a multitude of disciplines, there’s often a reduction in the number of staff required. To assist with calculating staff requirements prepare a project organisational chart. This shows the different levels and types of management required, the reporting structures, as well as the different roles and responsibilities. In addition the chart could indicate whether the staff are required full-time or shared between projects, and if they are Head Office or site-based positions. Remember also that if the project has to work nights, or weekends, additional staff will be required to supervise and manage these shifts. Conclusion It’s necessary that careful thought goes into correctly staffing your construction project to achieve the best balance of efficiencies and costs. In Australia for instance, the cost of a Supervisor is not much greater than some craft workers, so it may pay in some cases to have more supervision just to improve the efficiencies of the workers. Once you have determined the number and types of skills required you can begin sourcing the best people to fill the positions. This is a topic which I will deal with later. (Paul Netscher is the author of the acclaimed books ‘Successful Construction Project Management: The Practical Guide’ and ‘Building a Successful Construction Company: The Practical Guide’. Both books are available in paperback and E-book from Amazon and other retail outlets. This article is adapted from his book ‘Successful Construction Project Management’) construction management construction project management
3 Comments
Jose Colon
27/4/2020 10:01:20 pm
What do you recommend as foreman to worker ratio for a large job?
Reply
Paul
28/4/2020 11:46:44 am
Hello Jose, the foreman ration depends on a number of things. A skilled workforce may require less supervision. Intricate tasks require more supervision. Projects that are spread out may require more supervision as the foreman spends time moving between tasks. Experienced foremen can look after a bigger team. If the foreman is responsible for setting out the work this takes time. Work that is labour intensive may mean more people per foreman. Some clients demand a particular ratio - particular where safety is an issue.
Reply
14/7/2020 07:47:00 pm
Wonderful information about what you should consider when staffing your construction projects, thanks a lot for sharing kind of content with us. Your blog gives the best and the most interesting information. I wonder if we can gather such practical information about it, a great post definitely to come across.
Reply
Your comment will be posted after it is approved.
Leave a Reply. |
Archives
June 2024
Note: We welcome genuine comments, especially comments that add additional information to the subject matter in the article. We however reserve the right to remove inappropriate comments, which includes comments that have nothing to do with the subject, comments that include inappropriate language, and comments that are an advertisement for a product or company, or which include an advertising link. Comments must be in English. We will not enter into discussion on why a particular comment was removed.
CategoriesCopyright 2016 - The attached articles cannot be reproduced for commercial purposes without the consent of the author.
The opinions expressed in the attached articles are those of the writer. It should be noted that projects are varied and different laws and restrictions apply which depend on the location of the contractor and the project. It's important that the reader uses the supplied information taking cognisance of their particular circumstances. The writer assumes no responsibility or liability for any loss of any kind arising from the reader using the information or advice contained herein. "I have what I consider some of the best books on construction management."
Books are available from: Amazon.com Amazon.co.uk takealot.com kalahari.com Amazon.in Amazon.de Amazon.fr Amazon.it Amazon.com.au Powell's Fishpond uread bokus Amazon.ca Amazon.es Other retail stores Available in paperback or on Kindle "28 YEARS OF CONSTRUCTION PROJECT MANAGEMENT EXPERIENCE, DEVELOPING SUCCESSFUL CONSTRUCTION PROJECT MANAGERS AND BUILDING SUCCESSFUL CONSTRUCTION COMPANIES"
|